Tuesday, Oct 1st, remaining cars parked in Shambhala lot had to vacate.
Weds Oct 2nd, they did asbestos abatement and dropped off the heavy equipment.
Thurs Oct 3rd, they turned off the water for all Sherwin on the South side of the street from Sheridan to the Lake (which includes Levy House). A locksmith also changed or removed locks to front door.
Friday Oct 4th, fencing surrounds 7331 N. Sheridan Road property and back wall of building is demolished with no demolition permit on record. In addition, demolition started without proper fencing erected. (Video to be posted soon).
Building Permit was available on record by October 5th.
ReplyDelete